DQ Contracting logo

DQ Contracting

Farm House Bathroom

Bathroom
Medium (< 1000 sqft)
Materials$11,555
Contingencies$7.80k – $22.00k
Total Range$19.36k – $33.55k

Adjust the Material Quantities & Contingencies Below

Style Images

Style image 1 of 1

Materials & Services

Adjust quantities as needed. Unit prices are fixed.

Medium (< 1000 sqft)
Floor Tile - Matte Hexagon Porcelain Tile, 8-10 inch format
QTY per Sqft
@ $12.50
Total
$1,000
Wall Tile (Feature) - Ceramic Subway Tile, 3x12 installed in Herringbone Pattern
QTY per Sqft
@ $14.00
Total
$700
Wall Cladding (Wet Area) - Large Format Porcelain Slab / Marble-Look Panel
QTY per Sqft
@ $22.00
Total
$1,980
Vanity Cabinetry - White Oak Veneer, Shaker/Flat Panel Hybrid
QTY per LF
@ $450.00
Total
$2,250
Countertop - Engineered Quartz, 3cm thickness
QTY per Sqft
@ $85.00
Total
$1,020
Bathtub - Freestanding Acrylic Soaking Tub
QTY per Unit
@ $1,800.00
Total
$1,800
Sink Faucet - Widespread 8-inch, High-Arc Spout with Lever Handles
QTY per Unit
@ $350.00
Total
$700
Tub Filler - Deck Mounted Roman Tub Faucet with Hand Shower
QTY per Unit
@ $600.00
Total
$600
Vanity Mirror - Rectangular Metal Framed with Radius Corners
QTY per Unit
@ $250.00
Total
$500
Wall Sconce - Cylindrical Shade with Metal Backplate
QTY per Unit
@ $180.00
Total
$540
Cabinet Hardware - Contemporary Bar Pulls and Round Knobs
QTY per Unit
@ $12.00
Total
$120
Interior Paint - Mold/Mildew Resistant Bathroom Formula, Satin Finish
QTY per Gallon
@ $65.00
Total
$65
Plumbing Sink - Rectangular Undermount Porcelain
QTY per Unit
@ $140.00
Total
$280
Subtotal
$11,555

Contingencies

Select severity levels. Allowances are calculated automatically.

Access Conditions
Min ($)
$500
Max ($)
$1,500
Existing Finish Removal Complexity
Min ($)
$500
Max ($)
$1,500
Hazardous or Regulated Materials
Min ($)
$1,500
Max ($)
$4,000
Hidden Structural Conditions
Min ($)
$1,000
Max ($)
$3,000
MEP Compliance Gaps
Min ($)
$1,000
Max ($)
$3,000
Moisture & Water Intrusion
Min ($)
$1,000
Max ($)
$2,500
Permitting & Code Requirements
Min ($)
$500
Max ($)
$2,000
Scope Alignment & Design Adjustments
Min ($)
$1,000
Max ($)
$2,500
Substrate & Support Deficiencies
Min ($)
$800
Max ($)
$2,000
Subtotal
$7,800.00 - $22,000.00